It included Inside and outside painting, PCC for the floor of the masjid, Inside gypsum work, Installation of doors and windows, Installation of Marble stone for inside, Plastering for the ablution place, and exterior plastering of masjid building, RCC of the minaret, Ceramics work for ablution place, Stonemasonry for a septic tank.