Al-Gharrafa Charity Foundation signed a Memorandum of Understanding with the Independent Civil Aviation Authority to reduce Afghanistan’s air transportation problems, helping Afghanistan’s economic development by strengthening aeronautical services and developing Afghanistan’s air transport infrastructure in line with international standards. Based on the materials of this Memorandum and the request of the Government of the Islamic Republic of Afghanistan, the foundation committed itself to rebuild Farah Airport and providing its equipment.
New terminal on one floor with two indoor and outdoor halls, men’s and women’s toilets, an interior and exterior VIP hall, a passport check-out and all modern system of water and electricity.
The control tower has four floors, equipped with rooms, toilets and kitchens, etc. The necessities have been built.
The fire station was built in one floor with rooms for staff, toilets, kitchens, office buildings, garages for car parking and a repair room for fire station car.
January 2017
Start Date
Junuary 2018
Finish Date
12 Month
Project Duration
905,000 $
Budget
Picture Gallery Of This Project
Kabul Office
Address:
Kabul-Forth District-Between Of Parwan 2 And Parwan 3 Square
Email:
info@algharrafa.org.af
Herat Office
Address:
Herat – 8th district, Qul Urdu, Ansari 6
Email:
info@algharrafa.org.af
Farah Office
Address:
Farah- Center of the Farah City, 6th district
Email:
info@algharrafa.org.af